20206月13
Information Seminar - Unleashing BIM Potentials to Meet Challenges
论坛、工作坊与研讨会
- 日期2020-06-13
- 时间3:00 pm - 5:00 pm
- 地点Lecture Theatre 5, THEi (Tsing Yi) (Updated)
[具体内容只有英文版]
Introduction
BIM is commonly adopted by architects, consultants, contractors, and property owners in Hong Kong. But is it just 3D presentations and virtual walkthroughs? In order for the construction industry to maximize the fu ll potentials of BIM, we need to identify new opportunities to apply the technology and solve the related challenges. This seminar will explore the unleashing of BIM to meet today’s challenges and cover the following topics:
- BIM Standards
- Integrated Digi tal Delivery
- Digital Transformation through Machine Learning, AI and Big Data Analytics
- IoT Integrations using 5G Technology
- Smart City Development
About the Speaker
Vincent Yuen is a former Director at Gammon Construction Limited and Project Director at Dragages Hong Kong Limited, also serving as Committee Member (Building Division) of the Hong Kong Institution of Engineers and Board Member of the Hong Kong Concrete Institute.
Ir Yuen is a Chartered Builder, a Chartered Civil Engineer, a Chartered Manager, a Registered Professional Engineer with proven track records of leading and motivating large team of consultants and construction professionals to facilitate delivery of extremely fast track and large scale projects, including the Midfield concourse project at the Hong Kong International Airport, the design and build construction of the Cruise Terminal Building for the Kai Tak Development, KCRC Contract LDB201 Sheung Shui to Chau Tau EPBTBM tunneling and civil engineering works.
With regard to BIM implementation and management, Vincent supervised a team of BIM modellers at the HKAA Midfield Project for design, crash analysis, workability and methodology studies of ABWF, MEP, structural headroom, quality controls, facade and cladding works, sophi sticated ceiling panels profile and installation. In addition, he was the “Director Director-in-Charge” of a 1.6 billion Grade A class commercial building which adopted BIM applications in associated with facility management optimising energy consumption of futu re building operations.
**This seminar will be conducted in Cantonese and supplemented with English**
THEi engineering students will receive an attendance certificate for their CPD log.
Registration (Deadline: 11 Jun 2020)
Please click here or scan the QR code in the image above.